![Mobile National MS Society Logo](https://dn9tckvz2rpxv.cloudfront.net/nationalmssociety.jobs/Logo.png)
Job Information
LinkedIn Senior Data Center Construction Manager (Manassas, VA) in Sunnyvale, California
Data center engineering is the process of designing, building, and maintaining data centers, which are facilities used to house and manage critical IT infrastructure, applications, and data in our Richmond, VA site. Data center engineers ensure the data center infrastructure's stability, reliability, and security. They are crucial in supporting the availability and performance of applications and services. This involves the design, construction, and maintenance of the physical infrastructure of a data center, including electrical and mechanical systems.
Data Center Construction management is a very specific construction skillset that requires knowledge in the data center industry and specific critical infrastructure systems and design. It is the requirement of the Data Center Construction manager to understand not only standard construction practices but also the highly complex and integrated nature of data center design. A successful Data Center Construction manager will have experience and intimate knowledge of all the systems that are required to successfully deliver a world class data center that can serve the needs of the company and LinkedIn’s members.
At LinkedIn, we trust each other to do our best work where it works best for us and our teams. This role offers a hybrid work option, meaning you can both work from home and commute to a LinkedIn office, depending on what’s best for you and when it is important for your team to be together.
This role will be based in Richmond,VA .
This role, due to the business needs of the team, requires employees to be physically present in the specified office on a full-time basis. This helps to ensure you are best equipped to be successful and have the experience you need to fulfill the responsibilities of the role.
Key job responsibilities
•Knowledge of critical data center equipment (Generators, Uninterruptible Power Supplies, Switchgear, Transformers, Power Feeders, Chillers, Plumbing, Fire Detection/Suppression, Air Handling Units, Computer Room Air Handling/Conditioning Units, UPS, CRAH, CRAC).
•Communication skills, attention to detail, maintain high quality standards.
•Drive practical constructability standards in design documentation.
•Perform constructability reviews of electrical and mechanical designs associated with the construction of new data centers or optimization of existing data centers.
•Act as the point of escalation for complex constructability issues.
•Provide input into global standards and data center template designs.
•Conduct negotiations with contractors/subcontractors and evaluate bids/proposals with detail and accuracy.
•Develop detailed project plans to meet the delivery timelines.
•Review bid summaries, schedules and milestones, labor pricing, and perform subcontractor evaluations.
•Financial analysis of construction cost at multiple milestones.
•Collect, organize, apply and hand off lessons learned to design, pre-construction and construction teams to achieve continuous improvement across the entire program.
•Up to 25% travel required.
Basic Qualifications
• Bachelor’s Degree in Construction Management, Civil, Structural, Mechanical or Electrical
Engineering or 8+ years of relevant experience.
• 5+ years of experience in data center delivery (design, commissioning and construction),
mission critical facilities or equivalent.
• 5+ years of experience of end to end project delivery.
• Organization and communications skills.
• Ability to multi-task in a dynamic and fast paced environment.
• Microsoft Office (Excel, Visio, Word and PowerPoint) skills + ability & willingness to learn and
use an internal program management platform consistently to update project progress.
• Knowledge of AIA standard documentation.
• Problem-solving skills.
Preferred Qualifications
• Masters of Science Degree in Engineering or Construction related discipline.
• Certifications such as Professional Engineer (PE), LEED, and/or Certified Construction
Manager (CCM).
• Project Management Professional (PMP) or equivalent certification.
• Ability to develop new concepts through exploration, design, testing and into
deployment/mass production.
• Experience directly related to the design or construction of data centers/critical infrastructure
or large-scale mechanical and electrical plants.
• Experience of working with large data center providers in multiple regions.
• Large infrastructure project experience.
• Vendor management experience.
• Sustainable design experience.
• Knowledge of building codes and regulations including Life Safety, IBC, NFPA, NEC, and
OSHA.
• Experience in controls and commissioning of large-scale projects.
• Experience with power management and power monitoring systems.
• Experience with methods of procedure (MOPs), change management (CMs) and facility
operations.
• Experience driving Continuous Improvement methodologies, practices
Suggested Skills:
Data Center Construction
Infrastructure Project Experience
Project Management Professional
You will Benefit from our Culture:
We strongly believe in the well-being of our employees and their families. That is why we offer generous health and wellness programs and time away for employees of all levels.
LinkedIn is committed to fair and equitable compensation practices.
The pay range for this role is $103,000 to $170,000. Actual compensation packages are based on several factors that are unique to each candidate, including but not limited to skill set, depth of experience, certifications, and specific work location. This may be different in other locations due to differences in the cost of labor.
The total compensation package for this position may also include annual performance bonus, stock, benefits and/or other applicable incentive compensation plans. For more information, visit https://careers.linkedin.com/benefits.
Equal Opportunity Statement
LinkedIn is committed to diversity in its workforce and is proud to be an equal opportunity employer. LinkedIn considers qualified applicants without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class. LinkedIn is an Affirmative Action and Equal Opportunity Employer as described in our equal opportunity statement here: https://microsoft.sharepoint.com/:b:/t/LinkedInGCI/EeE8sk7CTIdFmEp9ONzFOTEBM62TPrWLMHs4J1C_QxVTbg?e=5hfhpE. Please reference https://www.eeoc.gov/sites/default/files/2023-06/22-088_EEOC_KnowYourRights6.12ScreenRdr.pdf and https://www.dol.gov/ofccp/regs/compliance/posters/pdf/OFCCP_EEO_Supplement_Final_JRF_QA_508c.pdf for more information.
LinkedIn is committed to offering an inclusive and accessible experience for all job seekers, including individuals with disabilities. Our goal is to foster an inclusive and accessible workplace where everyone has the opportunity to be successful.
If you need a reasonable accommodation to search for a job opening, apply for a position, or participate in the interview process, connect with us at accommodations@linkedin.com and describe the specific accommodation requested for a disability-related limitation.
Reasonable accommodations are modifications or adjustments to the application or hiring process that would enable you to fully participate in that process. Examples of reasonable accommodations include but are not limited to:
-Documents in alternate formats or read aloud to you
-Having interviews in an accessible location
-Being accompanied by a service dog
-Having a sign language interpreter present for the interview
A request for an accommodation will be responded to within three business days. However, non-disability related requests, such as following up on an application, will not receive a response.
LinkedIn will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by LinkedIn, or (c) consistent with LinkedIn's legal duty to furnish information.
Pay Transparency Policy Statement
As a federal contractor, LinkedIn follows the Pay Transparency and non-discrimination provisions described at this link: https://lnkd.in/paytransparency.
Global Data Privacy Notice for Job Candidates
This document provides transparency around the way in which LinkedIn handles personal data of employees and job applicants: https://lnkd.in/GlobalDataPrivacyNotice
LinkedIn
-
- LinkedIn Jobs